高清无码成人在线_自拍偷拍一区二区_97成人视频在线_日韩久久亚洲男人_亚洲91精品网站无码

×

News

Conch Chuangye Wuwei Haichuang Domestic Waste-to-energy Project Successfully Realizes the First Car of Waste into the Plant
Date:2021-12-07 From:海螺創(chuàng)業(yè)

        With the correct leadership of the company and the strong support of various departments, with the cooperation and cooperation of the construction unit, the supervision unit, the participating units and the brothers, all the staff of Conch Venture will work together, December 5, 2021 10 At 18 hours, the Wuwei Municipal Solid Waste Incineration Power Generation Project realized the smooth entry of the first vehicle of solid waste into the plant. Wuwei Urban Management Bureau, Shijian Town Government, all staff of Conch Venture Wuwei Haichuang and relevant persons in charge of the participating units of the Wuwei Project witnessed this moment.

825aefb77dd1bc08762ce7b18994d46.jpg

The first garbage truck entered the factory smoothly 

        At 10:18 in the morning, the domestic garbage truck of Wuwei City was accompanied by a rumbling of firecrackers, dressed in red silk and red flowers, under the command of the Wuwei Haichuang site staff, passing the logistics gate, floor scales, and trestle slowly. Drive into the unloading hall. With the call of "Conch Venture Wuwei Haichuang's First Garbage Start Unloading", the household garbage was smoothly discharged into the garbage pit.

1b04ffa253032227961f55530d3ca0b.jpg

Group photo 

        The Conch Chuangye Wuwei Haichuang project is equipped with 2×500 tons/day mechanical grate furnace domestic waste incinerators. The project is planned at one time and implemented in two phases. The first phase of the project has a processing scale of 500 tons/day, and it can process domestic waste after reaching production capacity18 10,000 tons/year.

3d29ccb92d37edcdd7eebc8db6ec8fe.jpg

Conch Chuangye Wuwei Haichuang Domestic Waste Incineration Power Generation Project (Aerial View) 

        Conch Chuangye Wuwei Haichuang’s first truck of garbage entered the plant smoothly, marking the end of the construction of the Wuwei municipal solid waste incineration power generation project, which is about to enter the trial production stage, and the project will enter the "countdown" for grid-connected power generation. Conch Entrepreneurship and Wuwei Haichuang all staff will continue their efforts and sprint with all their strength, starting from the ceremony of the first truck of garbage entering the factory, supervising the completion of the project, making solid preparations before trial production, and launching a sprint to the grid-connected power generation target within the year. Make more contributions to the harmless treatment of domestic garbage and the improvement of the living environment in Wuwei City!

晋州市| 长治市| 南丰县| 济宁市| 贺州市| 潞西市| 梨树县| 兴安盟| 萨迦县| 大庆市| 望城县| 张家口市| 天镇县| 壤塘县| 海南省| 信宜市| 万荣县| 陵水| 道孚县| 馆陶县| 唐山市| 阜康市| 马边| 宁武县| 桂阳县| 铜山县| 大英县| 县级市| 库车县| 湖北省| 济源市| 正宁县| 衢州市| 屯门区| 五莲县| 阿坝县| 都昌县| 洞口县| 梅河口市| 皋兰县| 牙克石市|